Our Projects

Flagship Development

Margam Data Centre

Margam is Biogenica’s flagship nature-positive data centre development – a world first, located at Port Talbot, Wales. Having secured planning consent in May 2026, the project is expected to become operational in 2028.

Key Outcomes

Designed from inception around renewable energy, circular biomass supply chains and measurable ecological outcomes, Margam demonstrates Biogenica’s integrated model for delivering energy security, digital infrastructure and nature regeneration through a single project.

Biogenica - Power 2.jpeg

Energy Security

geoffrey-moffett-eUJ94RVUSew-unsplash.jpg

Digital Infrastructure

jsb-co-cO2TawzB-vY-unsplash.jpg

Nature Regeneration

Margam in Numbers

14 MW

Renewable Baseload Power

Enough to power 40,000 homes, via a private power agreement with an existing biomass asset.

35.2K+

Hectares of Welsh forestry, agriculture and urban land secured

Delivering nature-positive landscape restoration across 35,200+ hectares, with selective harvesting (non-clear fell) across 2,640 hectares per year.

10k

Tonnes of Carbon to be Sequestered

This equals ~2,200 vehicles off the road each year, through circular local supply chains, improved forestry and land management, and sourcing forestry residues within a 60-mile radius. Planned carbon capture would add a further 80,000 tons per annum (~18,000 vehicles off the road).

1.5k

Hectares of Water Catchments

Margam will restore 1,500 hectares of river catchments (equivalent to ~4% of national Welsh river borders) through biodiverse planting schemes. This includes high-yielding species, species with premium offtake potential and species that enhance biodiversity.

Faster Than the Grid

The project combines dedicated renewable baseload power, carbon capture infrastructure and landscape-scale habitat restoration, creating a blueprint for next-generation infrastructure that generates positive outcomes for both operators and the natural environment.

AdobeStock_1025338247.jpeg

Continuous Cover Forestry

Biogenica has proprietary data and know-how that strengthens the economic case for forest owners to move to continuous cover forestry, having deployed it successfully in South Wales. Higher harvesting costs are offset by the higher prices of larger-diameter trees felled selectively, and a wider hardwood mix.

Biogenica - Forest Canopy.jpeg

Market-leading Track Record

Biogenica will work with WBE’s team, among the UK’s most prolific woodland and forestry consultants. They will deliver 100 hectares of forest creation in 2026, then expand to farmer clusters and measure below-ground biodiversity, ground cover, and vertebrate and invertebrate reintroductions.

Biogenica - Plant aerial.jpeg

Operational by 2028

 

Significantly faster than typical time-lines for new grid-connected data centre capacity in the UK. Biogenica is actively building a pipeline of additional projects in the UK and beyond.

AdobeStock_2015419403.jpeg

Community Inquiries

Members of the community whom have questions regarding the Margam Data Centre development are invited to request information and ask questions by contacting Welsh Bio Enterprises at the link below.